EasyManua.ls Logo

Cinderella FREEDOM - Performance Test Procedure

Cinderella FREEDOM
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
2.8 PERFORMANCE TEST TO VERIFY SYSTEM FUNCTIONALITY
When the “Start” button is pressed, the incineration cycle will be activated. The estimated incineration time
for the verication test is approximately 60 – 70 minutes. The yellow light will be lit when the incineration is
ongoing, and the complete test should be completed without any fault indications or system interruptions. The
toilet will have to cool down to the point that the fan has stopped before the ash container can be removed. The
cooling phase can take from 30 – 60 minutes, depending on the ambient cooling temperature.
The end result should only be ne white dust. Any end results deviating from this or an incineration time
exceeding 80 minutes may indicate a restriction in the ue vent or a lack of oxygen. Check that the installation is
in accordance with the specications in section 2.5.
1 meter
1,2 liter
2
1
3
60 - 70 minutes
5
6
4
CAUTION!
The ash container will get very hot while incinerating. Do not remove the front lid until the
toilet has cooled completely and the fan has stopped.

Other manuals for Cinderella FREEDOM

Related product manuals