6
5
4
6
2
3
2
3
Box 1/2 Cinderella Freedom ANZ Qty
1 Cinderella Freedom ANZ 1
2
Bowl liners 1
3
Product manual 1
4
Vent duct 1
5 Gas ttings
2
6 Docking station 1
7 Screws 3,5 mm 3
Box 2/2 Installation Kit Qty
1 Flue terminal w/ spark arrestor 5”
1
2
Reduction Tee 5x4” 1
3
Cinderella Adapter 1
2. INSTALLATION SECTION
2.1 SECURING THE TOILET TO THE FLOOR
It is essential to secure the toilet to the oor, and the Cinderella Freedom is therefore delivered with a custom
docking station to make this possible. It is important to be sure of the location of the toilet before fastening the
docking station to the oor. To install the docking station and toilet;
1. Remove the front cover
2. Cut away the transport safety strip, securing the ash container.
3. Removing the ash container, see page 18 for instructions operating the ash container.
4. Remove the two rear screws that secure the toilet to the shell, using two 10mm wrenches. It will be necessary
to hold on to the top while turning from the bottom, hold on to the screws.
5. Place the toilet on the docking and nd the desired positioning of the appliance, make a mark on the oor to
secure the location of the toilet. Then remove the toilet and fasten the docking to the oor.
NOTE!
This appliance must be installed by a qualied plumber /gas tter who can provide a
certicate of compliance in accordance with AS/NZS 5601.1. It is essential to ensure proper
ventilation in accordance with the guidelines in this manual to guarantee the functionality
of your new Cinderella toilet. Improper installation may cause malfunction, wear or odours
and will void the warranty.
Read each section carefully before starting the installation of the toilet. Always make sure
that the work is carried out by professionals in accordance with local regulations.