Slider fixing screws (part number - 48-101524-01).3
Step 6 As soon as the chassis is completely inserted, fasten the chassis with two screws (48-101524-01) on each side
of the bracket and tighten them to a torque value of 3.4 N-m (30 in-lbs).
The sliding rail must be used only during the first mounting process and it serves only to push
the chassis into the rack and not for sliding purpose. The chassis must be fixed with screws on
the front side.
Caution
Install Four Post Slider into EIA/ANSI Rack
Procedure
Step 1 Identify the four post slider.
Figure 20: Four Post Slider Identification
Check for the left/right marking on the sliders. This is left front sliding rail.1
Check for the left/right marking on the sliders. This is left rear sliding rail.2
Step 2 Prepare the four post slider.
Hardware Installation Guide for Cisco NCS 1001
23
Install Cisco NCS 1001
Install Four Post Slider into EIA/ANSI Rack