EasyManua.ls Logo

Cisco NCS 2006 User Manual

Cisco NCS 2006
510 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Cisco NCS 2000 Series Hardware Installation Guide
First Published: 2016-10-17
Last Modified: 2017-04-28
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Text Part Number:

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Cisco NCS 2006 and is the answer not in the manual?

Cisco NCS 2006 Specifications

General IconGeneral
Form FactorRack-mountable
Rack Units6 RU
Total Slots6
Wavelengths per Fiber PairUp to 96
Power SupplyRedundant AC or DC power supplies
Operating Temperature0°C to 45°C
Relative Humidity5% to 95% (non-condensing)
CoolingFront-to-back airflow
Management InterfaceEthernet

Summary

Overview

Compliance Standards

Details compliance requirements for NCS shelves with local and national electrical codes.

Cisco NCS 2002 Shelf

Provides an overview of the NCS 2002 shelf, its features, and specifications.

Cisco NCS 2006 Shelf

Provides an overview of the NCS 2006 shelf, its features, and specifications.

Cisco NCS 2015 Shelf

Provides an overview of the NCS 2015 shelf, its features, and specifications.

Preparing to Install the Cisco NCS 2002, NCS 2006, and NCS 2015 Shelf

Important Safety Recommendations

Outlines critical safety warnings and precautions for equipment installation.

Required Tools and Equipment

Lists the necessary tools and equipment for shelf installation and testing.

Cisco Supplied Materials

Details the materials supplied by Cisco for shelf installation.

User Supplied Materials

Lists the materials, tools, and equipment required but not supplied by Cisco.

Ordering Solutions for NCS 2002, NCS 2006, and NCS 2015

Describes the available ordering solutions for NCS shelves.

Card Slot Requirements

Explains the card slot configurations for NCS 2002, NCS 2006, and NCS 2015 shelves.

NTP-L41 Unpacking and Inspecting the Shelf

Procedure for unpacking and verifying the contents of the NCS shelves.

Cisco NCS 2002 Installation Overview

Mounting the brackets

Details the steps for mounting brackets for the NCS 2002 shelf.

Mounting the shelf

Describes the procedure for mounting the NCS 2002 shelf.

Installing the door and other modules

Explains how to install the door and other modules for the NCS 2002.

Connecting power and ground

Covers the steps for connecting power and ground for the NCS 2002.

Connecting and routing the cables

Details how to connect and route cables for the NCS 2002.

Installing and configuring the control card

Provides instructions for installing and configuring the control card.

Performing the shelf acceptance test

Describes the process for performing the shelf acceptance test for NCS 2002.

Installing the Air Flow Regulator

Air Deflector

Describes the air deflector as a sheet-metal part to orient airflow in the NCS 2002 shelf.

Air Plenum

Explains the air plenum's function in orienting airflow for GR-63 compliance.

Air Plenum Rack and Cabinet Compatibility

Details compatibility of air plenums with ANSI and ETSI racks and cabinets.

NTP-L42 Install the Air Plenum in NCS 2002 Shelf

Procedure to install the air plenum for front-to-back airflow in the NCS 2002 shelf.

Mounting the Cisco NCS 2002 Brackets

NTP-L44 Mounting the Brackets in ANSI Configuration

Installs 19-inch mounting brackets for NCS 2002 shelf in ANSI rack configuration.

NTP-L45 Mounting the Brackets in ETSI Configuration

Installs 19-inch mounting brackets for NCS 2002 shelf in ETSI rack configuration.

Mounting the Cisco NCS 2002 Shelf

ANSI Rack Installation

Describes mounting the NCS 2002 shelf on 19-inch or 23-inch ANSI equipment racks.

ETSI Rack Installation

Describes mounting the NCS 2002 shelf on ETSI standard equipment racks.

Wall Mounting the NCS 2002 Shelf

Explains how to mount the NCS 2002 shelf on a wall using brackets.

NTP-L42 Installing the NCS 2002 Shelf

Procedure for installing the NCS 2002 shelf in various mounting configurations.

Connecting Power and Ground

Power and Ground Description

Describes power and ground connections for NCS 2002 shelves according to standards.

ANSI Power and Ground

Details AC and DC power and ground specifications for NCS 2002 in ANSI environments.

ETSI Power and Ground

Details AC and DC power and ground specifications for NCS 2002 in ETSI environments.

NTP-L35 Installing the Power and Ground to the NCS 2002 Shelf

Procedure to install power feeds and grounds for the NCS 2002 system.

Connecting and Routing the Cables and Wires

Cable Routing and Management

Discusses cable routing and management for NCS 2006 shelf.

Default Module

Describes the default fiber module and replacement with cable module for NCS 2006.

Fiber Module

Details specifications for the fiber module and fiber channel capacity.

NTP-L13 Installing the Cable and Fiber Modules

Procedure to install cable and fiber modules in the NCS 2006 system.

DLP-L23 Removing the Fiber Module

Procedure to remove the default fiber module from the NCS 2006 system.

DLP-L24 Installing the Cable Module

Procedure to install the cable module in the NCS 2006 system.

DLP-L25 Routing and Locking Cables

Task to route and lock cables on the NCS 2006 system.

NTP-L14 Attaching Wires to Alarm, Timing, LAN, and Craft Pin Connections

Procedure to attach alarm, timing, LAN, and craft wires in the NCS 2006 shelf.

DLP-L26 Installing Alarm Wires in NCS 2006

Installs alarm cables on the ECU module for external alarms and controls.

DLP-L27 Installing Timing Wires on NCS 2006 - ANSI

Installs timing cables on the NCS 2006 ECU module for ANSI.

DLP-L28 Installing Timing Wires in NCS 2006 - ETSI

Installs timing cables on the NCS 2006 ECU module for ETSI.

DLP-L29 Installing LAN Wires in NCS 2006

Installs LAN wires on the ECU module of the NCS 2006.

Cisco NCS 2002 Shelf Installation Acceptance Test

NTP-L38 Performing the NCS 2002 Shelf Installation Acceptance Test

Procedure to perform a shelf installation acceptance test for the NCS 2002.

DLP-L60 Inspecting the NCS 2006 Shelf Installation and Connections

Inspects shelf installation and connections for NCS 2006, verifying proper setup.

DLP-L61 Measuring DC Voltage on the NCS 2006 Shelf

Measures DC voltage to verify correct power and returns for the NCS 2006 shelf.

Installing the Cisco NCS 2002 Door and Other Modules

Front Door

Describes the NCS 2002 front door, its types, and access.

NTP-L29 Installing the Standard Door of the NCS 2002 Shelf

Procedure to install the standard door of the NCS 2002 shelf.

NTP-L30 Opening and Removing the Standard Door of the NCS 2002 Shelf

Procedure to open and remove the standard door of the NCS 2002 shelf.

NTP-L40 Installing the Deep-Front Panel of the NCS 2002 Shelf

Procedure to install the deep-front panel of the NCS 2002 shelf.

NTP-G331 Removing the Deep-Front Panel of the NCS 2002 Shelf

Procedure to remove the deep-front panel of the NCS 2002 system.

Power Modules

Describes pluggable power modules for the NCS 2002 shelf.

NTP-L33 Installing the Power Module in the NCS 2002 Shelf

Procedure to install the power module in the NCS 2002 system.

Fan-Tray Assembly

Details the fan-tray assembly for the NCS 2002 shelf, including LEDs and LCD.

NTP-L35 Installing the Fan-Tray Assembly in the NCS 2002 Shelf

Procedure to install the FTA fan-tray assembly in the NCS 2002 system.

Air Filter

Describes the disposable air filter for the NCS 2002 shelf and its maintenance.

NCS 2006 Installation Overview

Installing the Air Flow Regulator

Explains installation of regulators to maintain airflow for ANSI/ETSI configurations in NCS 2006.

Mounting the Brackets on NCS 2006 Shelf

Details the procedure for mounting brackets on the NCS 2006 shelf.

Mounting the Cisco NCS 2006 Shelf

Describes how to mount the Cisco NCS 2006 shelf.

Installing the Cisco NCS 2006 Door and Other Modules

Explains how to install the NCS 2006 door and other modules.

Connecting Power and Ground

Explains how to connect power and ground for the NCS 2006 shelf.

Installing and Configuring the Control Card

Describes procedures for installing and configuring control cards.

NCS 2006 Shelf Installation Acceptance Test

Explains how to perform a shelf acceptance test on the NCS 2006 shelf.

Installing the Air Flow Regulator

Air Deflector

Describes the air deflector's role in orienting airflow on the NCS 2006 shelf.

Air Plenum

Explains air plenum function for front-to-back airflow in NCS 2006, compliant with GR-63.

Air Plenum Rack and Cabinet Compatibility

Details compatibility of air plenums with ANSI and ETSI racks and cabinets for NCS 2006.

NTP-L43 Install the Air Plenum in NCS 2006 Shelf

Installs air plenum for front-to-back airflow in the NCS 2006 shelf.

Mounting the Brackets on NCS 2006 Shelf

NTP-L2 Mounting the Brackets in ANSI Configuration

Procedure to mount brackets on the NCS 2006 shelf for ANSI rack configuration.

NTP-L46 Mounting the Brackets in ETSI Configuration

Procedure to mount brackets on the NCS 2006 shelf for ETSI rack configuration.

Mounting the Cisco NCS 2006 Shelf

ANSI Rack Installation

Describes mounting NCS 2006 shelf on 19-inch or 23-inch ANSI racks.

ETSI Rack Installation

Describes mounting NCS 2006 shelf on ETSI standard equipment racks.

NTP-L3 Mounting the NCS 2006 Shelf

Procedure to mount the NCS 2006 shelf.

Connecting Power and Ground

Power and Ground Description

Describes power and ground connections for NCS 2006 shelves.

ANSI Power and Ground

Details AC and DC power and ground for NCS 2006 in ANSI environments.

ETSI Power and Ground

Details AC and DC power and ground for NCS 2006 in ETSI environments.

NTP-L12 Installing Power and Ground to the NCS 2006 Shelf

Installs power feeds and grounds for the NCS 2006 system.

Connecting and Routing the Cables

Cable Routing and Management

Discusses cable routing and management for the NCS 2006 shelf.

Default Module

Describes the default fiber module and replacement with cable module for NCS 2006.

Fiber Module

Details fiber module specifications and fiber channel capacity.

NTP-L13 Installing the Cable and Fiber Modules

Procedure to install cable and fiber modules in the NCS 2006 system.

DLP-L23 Removing the Fiber Module

Procedure to remove the default fiber module from the NCS 2006 system.

DLP-L24 Installing the Cable Module

Procedure to install the cable module in the NCS 2006 system.

DLP-L25 Routing and Locking Cables

Task to route and lock cables on the NCS 2006 system.

NTP-L14 Attaching Wires to Alarm, Timing, LAN, and Craft Pin Connections

Procedure to attach alarm, timing, LAN, and craft wires in the NCS 2006 shelf.

DLP-L26 Installing Alarm Wires in NCS 2006

Installs alarm cables on the ECU module for external alarms and controls.

DLP-L27 Installing Timing Wires on NCS 2006 - ANSI

Installs timing cables on the NCS 2006 ECU module for ANSI.

DLP-L28 Installing Timing Wires in NCS 2006 - ETSI

Installs timing cables on the NCS 2006 ECU module for ETSI.

DLP-L29 Installing LAN Wires in NCS 2006

Installs LAN wires on the ECU module of the NCS 2006.

NCS 2006 Shelf Installation Acceptance Test

NTP-L18 Performing NCS 2006 Shelf Installation Acceptance Test

Procedure to perform a shelf installation acceptance test for the NCS 2006 shelf.

DLP-L63 Inspecting the Shelf

Verifies the physical condition of the NCS 2006 shelf assembly.

DLP-L61 Measuring DC Voltage on the NCS 2002 Shelf

Measures DC voltage for the NCS 2002 shelf, likely a reference to checking power.

Installing the Cisco NCS 2006 Door and Other Modules

Front Door

Describes the NCS 2006 front door, its types, and access.

NTP-L4 Installing the Standard Door of the NCS 2006 Shelf

Procedure to install the standard door of the NCS 2006 shelf.

NTP-L5 Opening and Removing the Standard Door of the NCS 2006 Shelf

Procedure to open and remove the standard door of the NCS 2006 shelf.

NTP-L39 Install the Deep-Front Panel of the NCS 2006

Procedure to install the deep-front panel of the NCS 2006.

NTP-L40 Remove the Deep-Front Panel of the NCS 2006 Shelf

Procedure to remove the deep-front panel of the NCS 2006 system.

External Connection Units

Describes external connection units (ECU) for NCS 2006.

Power Modules

Details pluggable power modules for AC and DC power for NCS 2006.

NTP-L9 Installing the Power Modules in the NCS 2006 Shelf

Procedure to install power modules in the NCS 2006 system.

LCD Unit

Describes the LCD unit for the NCS 2006 system.

Fan-Tray Assembly

Details the fan-tray assembly for the NCS 2006 shelf, including LEDs.

NTP-L11 Installing the Fan-Tray Assembly in the NCS 2006 Shelf

Procedure to install the NCS2006-FTA fan-tray assembly in the NCS 2006 system.

Air Filter

Describes the disposable air filter for the NCS 2006 shelf and its maintenance.

NCS 2015 Installation Overview

Mounting the Brackets on the NCS 2015 Shelf

Describes how to mount brackets on the NCS 2015 shelf.

Mounting the Cisco NCS 2015 Shelf

Describes how to mount the Cisco NCS 2015 shelf.

Connecting Power and Ground

Explains how to connect power and ground for the NCS 2015 shelf.

Connecting and Routing the Cables

Describes how to connect and route cables for NCS 2015.

NCS 2015 Shelf Installation Acceptance Test

Describes how to perform a shelf acceptance test on NCS 2015 shelf.

Installing the Cisco NCS 2015 Door and Other Modules

Explains how to install the NCS 2015 door and other modules.

Installing and Configuring the Control Card

Describes procedures for installing and configuring control cards for NCS 2015.

Mounting the Brackets on the NCS 2015 Shelf

NTP-L48 Mounting Brackets on NCS 2015 Shelf for ANSI Rack Configuration

Helps in mounting brackets on NCS 2015 shelf for ANSI rack configuration.

NTP-L49 Mounting Brackets on NCS 2015 Shelf for ETSI Rack Configuration

Helps in mounting brackets on NCS 2015 shelf for ETSI rack configuration.

Mounting the Cisco NCS 2015 Shelf

ANSI Rack Installation

Describes mounting the NCS 2015 shelf on ANSI equipment racks.

ETSI Rack Installation

Describes mounting the NCS 2015 shelf on ETSI standard equipment racks.

NTP-L47 Mounting NCS 2015 Shelf

Procedure to mount the NCS 2015 shelf.

Connecting Power and Ground

Power and Ground Description

Describes power and ground connections for NCS 2015 shelves.

Cabling Guidelines for NCS 2015 DC Shelf

Displays cable distribution in NCS 2015 DC shelf and rack recommendations.

NTP-L57 Installing Power and Ground to the NCS 2015 Shelf

Installs power feeds and grounds for the NCS 2015 system.

Connecting and Routing the Cables

Cable Routing and Management

Discusses cable routing and management for the NCS 2015 shelf.

Default Module

Describes the default fiber module and replacement with cable module for NCS 2015.

Fiber Module

Details fiber module specifications and fiber capacity for NCS 2015.

NTP-L55 Routing and Locking Cable and Fiber Modules

Routes and locks cables on the NCS 2015 system.

NTP-L56 Attaching Wires to Alarm, Timing, LAN, and Craft Pin Connections

Attaches alarm, timing, LAN, and craft wires in the NCS 2015 shelf.

DLP-L76 Installing Alarm Wires in NCS 2015

Installs alarm cables on the power input panel for external alarms and controls.

DLP-L77 Installing Timing Wires on NCS 2015

Installs timing cables on the power input panel.

DLP-L78 Installing LAN Wires in NCS 2015

Installs LAN wires on the ECU module of the NCS 2015.

NCS 2015 Shelf Installation Acceptance Test

NTP-L60 Performing NCS 2015 Shelf Installation Acceptance Test

Performs a shelf installation acceptance test for the NCS 2015 shelf.

DLP-L63 Inspecting the Shelf

Verifies the physical condition of the NCS 2006 shelf assembly.

Installing the Cisco NCS 2015 Door and Other Modules

Front Door

Describes the NCS 2015 front door, its types, and access.

NTP-L67 Installing Fiber Tray of NCS 2015 Shelf

Installs the standard or extended fiber tray of the NCS 2015 shelf.

NTP-L50 Installing Standard Door of NCS 2015 Shelf

Installs the standard door of the NCS 2015 shelf.

NTP-L61 Installing Deep Door of NCS 2015 Shelf

Installs the deep door of the NCS 2015 shelf.

NTP-L51 Opening and Removing the Door of the NCS 2015 Shelf

Procedure to open and remove the door of the NCS 2015 shelf.

External Connection Units

Describes external connection units (ECU) for NCS 2015.

NTP-L52 Install NCS 2015 ECU Module

Installs the external connection unit (ECU) in the NCS 2015 shelf.

Power Modules

Details pluggable power modules for AC and DC power for NCS 2015.

NTP-L53 Installing the Power Modules in NCS 2015 Shelf

Procedure to install the power modules in the NCS 2015 system.

LCD Unit

Describes the LCD unit for the NCS 2015 system.

Fan-Tray Assembly

Details the fan-tray assembly for the NCS 2015 shelf.

NTP-L54 Installing Fan-Tray Assembly in NCS 2015 Shelf

Installs the NCS2015-FTA fan-tray assembly in the NCS 2015 system.

Air Filter

Describes the disposable air filter for the NCS 2015 shelf and its maintenance.

Installing and Configuring the Control Card

NTP-L41 Installing and Configuring the TNC, TNCE, TSC, TSCE, TNCS, or TNCS-O Card

Installs and configures TNC, TNCE, TSC, TSCE, TNCS, or TNCS-O cards.

Filler and Blank Cards

Describes filler and blank cards for ensuring proper airflow and EMI requirements.

Multishelf Management

NTP-L15 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending Shelves

Procedure to connect NCS 2006 multishelf node and subtending shelves.

NTP-G318 Connecting the NCS 2006 Multishelf Node and the NCS 2006 Subtending Shelves in a Ring Topology

Connects NCS 2006 multishelf node and subtending shelves in a ring topology.

Multishelf Management in Cisco NCS 2015

Describes various multishelf LAN topologies supported in Cisco NCS 2015.

NTP-L62 Installing the SFP Module on the NCS 2015 ECU

Procedure to install SFP modules in the SFP ports of NCS 2015 ECU.

NTP-L63 Configure a Cisco Catalyst 3560 (Active and Standby) for a Multishelf Node

Uses Cisco IOS to configure Catalyst 3560 for multishelf node configuration.

NTP-L64 Connect the ONS 15454 Node Controller to an MS-ISC-100T Card

Connects ONS 15454 node controller to MS-ISC-100T cards.

Shelf Voltage and Temperature

Displays shelf voltage and temperature in CTC for NCS 2006 chassis.

Cooling Profile

Allows control of fan speed in NCS 2006 shelf based on I/O cards.

Maintaining the NCS 2002, NCS 2006, and NCS 2015 Shelves

NTP-L19 Replacing the Air Filter of the NCS 2002 Shelf Assembly

Replaces the air filter of the NCS 2002 shelf assembly.

NTP-L20 Replacing the Air Filter of the NCS 2006 Shelf Assembly

Replaces the air filter of the NCS 2006 shelf assembly.

NTP-L21 Replacing the Air Filter of the AC Power Module in the NCS 2006 Shelf Assembly

Replaces the air filter of the AC power module in the NCS 2006 shelf assembly.

NTP-L58 Replacing the Air Filter of the NCS 2015 Shelf Assembly

Replaces the air filter of the NCS 2015 shelf assembly.

NTP-L22 Cleaning Fiber Connectors

Procedures for cleaning fiber connectors.

NTP-L25 Replacing the Fan-Tray Assembly of the NCS 2002 Shelf Assembly

Replaces the fan-tray assembly of the NCS 2002 shelf assembly.

NTP-L26 Replacing the Fan-Tray Assembly of the NCS 2006 Shelf Assembly

Replaces the fan-tray assembly of the NCS 2006 shelf assembly.

NTP-L59 Replacing Fan-Tray Assembly of NCS 2015 Shelf Assembly

Replaces the fan-tray assembly of the NCS 2015 shelf assembly.

Hardware Specifications

NCS 2002 Shelf Specifications

Provides specifications for NCS 2002 shelf bandwidth, topologies, and interfaces.

NCS 2006 Shelf Specifications

Provides specifications for NCS 2006 shelf bandwidth, topologies, and interfaces.

NCS 2015 Shelf Specifications

Provides specifications for NCS 2015 shelf bandwidth, topologies, and interfaces.

Related product manuals