NTP-L2 Mounting the Brackets in ANSI
Configuration , on page 163.
•
NTP-L5 Opening and Removing the Standard
Door of the NCS 2006 Shelf , on page 252.
•
Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, see the Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series .
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
While changing the power modules from NCS2006-DC20 to NCS2006-DC and vice-versa, the NCS 2006
shelf can temporarily work with both NCS2006-DC and NCS2006-DC20 power modules installed.
However, during regular operation, the shelf must either have the NCS2006-DC or NCS2006-DC20 power
module, but not both.
Caution
Cisco NCS 2000 Series Hardware Installation Guide
286
Installing the Cisco NCS 2006 Door and Other Modules
DLP-L15 Installing the DC Power Module in the NCS 2006 Shelf