The following figure shows a DC power module installed in Slot A and a power filler module installed in Slot
B.
Figure 172: Installing a Power Filler Module
Step 4
Return to your originating procedure (NTP).
When the NCS 2006 shelf is powered at –60 VDC (nominal), only the TNC, OPT-AMP-C,
OPT-AMP-17-C, OPT-EDFA-17, and OPT-EDFA-24 cards, and the NCS2006-ECU-60 can be
installed.
Note
DLP-L16 Replacing NCS2006-DC With NCS2006-DC20 Power Module
This procedure replaces the NCS2006-DC with
NCS2006-DC20 power module.
Purpose
#2 Phillips Dynamometric screwdriverTools/Equipment
NTP-L5 Opening and Removing the Standard Door
of the NCS 2006 Shelf , on page 252
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
Cisco NCS 2000 Series Hardware Installation Guide
289
Installing the Cisco NCS 2006 Door and Other Modules
DLP-L16 Replacing NCS2006-DC With NCS2006-DC20 Power Module