Procedure
Step 1
Complete the necessary task as applicable:
•
DLP-L47 Installing the AC Power Module in the NCS 2002 Shelf, on page 127
•
DLP-L48 Installing the DC Power Module in the NCS 2002 Shelf, on page 129
Step 2
Complete the NTP-L35 Installing the Power and Ground to the NCS 2002 Shelf, on page 76.
Stop. You have completed this procedure.
DLP-L47 Installing the AC Power Module in the NCS 2002 Shelf
This procedure installs the AC power module in the
NCS 2002 system.
Purpose
#2 Phillips screwdriverTools/Equipment
•
Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, refer to the Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series .
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Cisco NCS 2000 Series Hardware Installation Guide
127
Installing the Cisco NCS 2002 Door and Other Modules
DLP-L47 Installing the AC Power Module in the NCS 2002 Shelf

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco NCS 2006 and is the answer not in the manual?

Cisco NCS 2006 Specifications

General IconGeneral
BrandCisco
ModelNCS 2006
CategoryNetwork Hardware
LanguageEnglish

Related product manuals