DLP-L21 Turning On and Verifying AC Office Power on the NCS 2006 Shelf
This task turns on and verifies AC office power on
the NCS 2006 shelf.
Purpose
VoltmeterTools/Equipment
NTP-L2 Mounting the Brackets in ANSI
Configuration , on page 163.
NTP-L5 Opening and Removing the Standard
Door of the NCS 2006 Shelf , on page 252.
Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, see the Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series .
DLP-L18 Connecting Office Power (AC) to the
NCS 2006 Shelf, on page 204
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Do not apply power to the shelf until you complete all the installation steps.Caution
To ensure safety of personnel and equipment, do not connect any power cables into the power module
until the module is completely installed into the chassis. Statement 389
Warning
To reduce the risk of electric shock, switch on the power only after the power cord is completely
installed into the power module. Statement 390
Warning