Table 8: NCS 2002 Shelf Installation Task Summary
CompletedDescription
NTP-L41 Unpacking and Inspecting the Shelf, on
page 20
Connect the chassis to the office ground. For detailed
instructions on how to ground the chassis, refer to the
Electrostatic Discharge and Grounding Guide for
Cisco NCS 2000 Series
NTP-L30 Opening and Removing the Standard Door
of the NCS 2002 Shelf, on page 111
NTP-L35 Installing the Power and Ground to the NCS
2002 Shelf, on page 76
NTP-L35 Installing the Fan-Tray Assembly in the
NCS 2002 Shelf, on page 132
DLP-L62 Installing the TNC, TNCE, TSC, TSCE,
TNCS, or TNCS-O Card, on page 400
NTP-L29 Installing the Standard Door of the NCS
2002 Shelf, on page 108
Step 2
Complete the DLP-L49 Connecting Office Power (AC) to the NCS 2002 Shelf, on page 80.
Step 3
Complete the DLP-L61 Measuring DC Voltage on the NCS 2002 Shelf, on page 105.
Step 4
Continue with Connect the PC and Log into the GUI.
Stop. You have completed this procedure.
DLP-L60 Inspecting the NCS 2002 Shelf Installation and Connections
Use this task to inspect the shelf installation and
connections and verify that everything is installed
and connected properly.
Purpose
NoneTools/Equipment
NonePrerequisite Procedures
RequiredRequired/As Needed
Cisco NCS 2000 Series Hardware Installation Guide
104
Cisco NCS 2002 Shelf Installation Acceptance Test
DLP-L60 Inspecting the NCS 2002 Shelf Installation and Connections