Step 9
Install the pre-assembled air plenums in the ANSI 23-inch rack or cabinet.
Step 10
Check the length between the top and bottom horizontal air plenums where the chassis will be installed. The
length must be not less than 10.5 inches (267 mm). If the length is less, adjust the position of the top horizontal
plenum.
Step 11
Install the empty NCS 2006 chassis between the horizontal plenums.
Step 12
Return to your originating procedure (NTP).
DLP-L67 Installing Air Plenum for NCS 2006 Shelf in ETSI Configuration
This task installs the air plenum for the NCS 2006
shelf in the ETSI configuration.
Purpose
Cisco NCS 2000 Series Hardware Installation Guide
157
Installing the Air Flow Regulator
DLP-L67 Installing Air Plenum for NCS 2006 Shelf in ETSI Configuration