Stop. You have completed this procedure.
DLP-L49 Connecting Office Power (AC) to the NCS 2002 Shelf
This task connects AC power to the NCS 2002 shelf.Purpose
•
#2 Phillips Dynamometric screwdriver
•
Medium slot-head screwdriver
•
Small slot-head screwdriver
•
Wire wrapper
•
Wire cutters
•
Wire strippers
•
Crimp tool
•
Fuse panel
•
Ground cable 13.3-mm² (#6 AWG) stranded.
The PIDs of the power cables are listed in the
table below.
Tools/Equipment
•
Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, refer to the Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series
•
NTP-L30 Opening and Removing the Standard
Door of the NCS 2002 Shelf, on page 111
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
This product is intended for use on the TN and TT power systems.Note
Cisco NCS 2000 Series Hardware Installation Guide
80
Connecting Power and Ground
DLP-L49 Connecting Office Power (AC) to the NCS 2002 Shelf