EasyManua.ls Logo

Cisco NCS 2006 - NTP-L29 Installing the Standard Door of the NCS 2002 Shelf

Cisco NCS 2006
510 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Stop. You have completed this procedure.
DLP-L49 Connecting Office Power (AC) to the NCS 2002 Shelf
This task connects AC power to the NCS 2002 shelf.Purpose
•
#2 Phillips Dynamometric screwdriver
•
Medium slot-head screwdriver
•
Small slot-head screwdriver
•
Wire wrapper
•
Wire cutters
•
Wire strippers
•
Crimp tool
•
Fuse panel
•
Ground cable 13.3-mm² (#6 AWG) stranded.
The PIDs of the power cables are listed in the
table below.
Tools/Equipment
•
Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, refer to the Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series
•
NTP-L30 Opening and Removing the Standard
Door of the NCS 2002 Shelf, on page 111
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
This product is intended for use on the TN and TT power systems.Note
Cisco NCS 2000 Series Hardware Installation Guide
80
Connecting Power and Ground
DLP-L49 Connecting Office Power (AC) to the NCS 2002 Shelf

Table of Contents