CHAPTER 17
NCS 2006 Shelf Installation Acceptance Test
This chapter explains how to mount the brackets on Cisco NCS 2006 shelf.
NTP-L18 Performing NCS 2006 Shelf Installation Acceptance Test, page 243
NTP-L18 Performing NCS 2006 Shelf Installation Acceptance
Test
Use this procedure to perform a shelf installation
acceptance test for the NCS 2006 shelf.
Purpose
VoltmeterTools/Equipment
NonePrerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Procedure
Step 1
If you installed an NCS 2006 shelf, complete the table below by verifying that each applicable procedure was
completed.