Step 6
Install the pre-assembled air plenum for ANSI 23-inch configuration.
Figure 24: Pre-assembled air plenum
Step 7
Install the empty NCS 2002 chassis between the horizontal plenums.
Step 8
Return to your originating procedure (NTP).
DLP-L70 Installing Air Plenum for NCS 2002 Shelf in ETSI Configuration
This task installs the air plenum for the NCS 2002
shelf in the ETSI configuration.
Purpose
•
#2 Phillips Dynamometric screwdriver
•
Medium slot-head screwdriver
•
Small slot-head screwdriver
•
Screws: M6.0 x 20 pan-head Phillips screws (4)
•
Wing head screws (4)
•
Adapter plates
•
One air plenum kit (horizontal and vertical air
plenum)
Tools/Equipment
As neededRequired/As Needed
OnsiteOnsite/Remote
Cisco NCS 2000 Series Hardware Installation Guide
40
Installing the Air Flow Regulator
DLP-L70 Installing Air Plenum for NCS 2002 Shelf in ETSI Configuration

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco NCS 2006 and is the answer not in the manual?

Cisco NCS 2006 Specifications

General IconGeneral
BrandCisco
ModelNCS 2006
CategoryNetwork Hardware
LanguageEnglish