and ETSI:
•
#2 Phillips Dynamometric screwdriver
•
Medium slot-head screwdriver
•
Small slot-head screwdriver
•
Screws
•
Ground cable 13.3-mm² (#6 AWG) stranded
•
Listed pressure dual-holes lugs suitable for #8
AWG copper conductors
•
Wire cutters
•
Wire strippers
•
Crimp tool
•
Fuse panel
only:
•
Power cable (from fuse and alarm panel to
assembly), #8 AWG, copper conductors, 194
degrees F [90 degrees C])
•
Wire wrapper
ETSI only:
•
Power cable (from fuse panel to power
modules), shipped with the NCS 2006
•
Two-hole grounding lug, shipped with the NCS
2006
Tools/Equipment
•
NTP-L9 Installing the Power Modules in the
NCS 2006 Shelf , on page 282.
•
Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, see the Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series .
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Cisco NCS 2000 Series Hardware Installation Guide
201
Connecting Power and Ground
NTP-L12 Installing Power and Ground to the NCS 2006 Shelf