Cisco NCS 2006 - ETSI Rack Installation

Cisco NCS 2006
510 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
#2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Screws: #12-24 x 3/4 pan-head Phillips
mounting screws (4)
Wing head screws (4)
Adapter plates
One air plenum kit (horizontal and vertical air
plenum)
Tools/Equipment
As neededRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
The air plenums for ANSI 23-inch configuration can also be pre-assembled outside the cabinet and then
installed inside the cabinet. See DLP-L71 Installing Pre-assembled Air Plenums in ANSI 23-inch
Configuration, on page 38
Note
Cisco NCS 2000 Series Hardware Installation Guide
34
Installing the Air Flow Regulator
DLP-L69 Installing Air Plenum in NCS 2002 Shelf for ANSI 23-inch Configuration