Do you have a question about the ComAp intelilite nt amf25 and is the answer not in the manual?
Communication Ports | RS232, RS485, USB |
---|---|
Power Supply | 8-36 VDC |
Number of Digital Inputs | 8 |
Number of Digital Outputs | 8 |
Number of Analog Inputs | 3 |
Number of Analog Outputs | 2 |
Display | LCD with backlight |
Supported Protocols | Modbus |
Operating Temperature | -20°C to +70°C |
Humidity | 95% non-condensing |
Weight | 0.4 kg |
Protection | IP65 (front panel) |
Controller Type | AMF Controller |
Storage Temperature | -30 to +80 °C |
Crucial safety guidelines for IL-NT controllers installation and maintenance.
Precautions for dangerous voltage and adjusting controller set points.
Instructions for mounting the controller onto a switchboard door.
Schematic diagram for AMF wiring connections.
Wiring for stand-by applications using contactors.
Wiring for stand-by applications with two-position ATS.
General guidelines and steps for installing the controller and its components.
Recommendations for connecting CAN bus devices and network setup.
Recommendations for connecting RS485 devices and network setup.
List and description of default binary inputs for the IL-NT controller.
Outputs for controlling GCB and MCB close/open functions.
Instructions for setting and changing the controller password.
Configuration of basic settings like Gen-set Name, Nominal Power, and Current.
Selection of generator winding and measurement connection types.
Selection of communication protocols for COM1 and COM2 channels.
Configuration of IP address, NetMask, Gateway, and DHCP for Ethernet.
Configuration of APN Name, User Name, and User Pass for GPRS.
Configuration of AirGate service for remote access and monitoring.
Configuration for sending email and SMS messages for alarms and events.
Configuration of starting parameters like RPM, Oil Pressure, and Crank Times.
Configuration of Idle Time, Cooling Speed, and Cooling Time.
Configuration of Min Stab Time and Max Stab Time for generator stabilization.
Configuration of the Stop Time for engine shutdown.
Configuration for ProtectHoldOff and Horn Timeout settings.
Configuration of Overspeed protection and AI1 alarm thresholds.
Configuration of Overload BOC, Overload Del, Short Crct BOC, and Short Crct Del.
Configuration of Amps IDMT Del for generator overcurrent protection.
Configuration for current unbalance and generator voltage protections.
Configuration of generator frequency and voltage protection delays.
Configuration of AMF operation mode and Dual AMF settings.
Configuration of AMF timing delays like EmergStart Del and Transfer Del.
Configuration of mains voltage and frequency protections and delays.
Setting the logic for the MCB CLOSE/OPEN output.
Configuration of the controller's behavior in TEST mode.
Setting when the MCB opens based on Mains Fail or Genrun.
Configuration of Timer functions for controlling outputs and events.
Configuration for sending SMS and email alerts for alarms.
Enabling/disabling SMS/email messages for different alarm types.
Diagrams for connecting engines with J1939 support via CAN bus.
Timing relationships between mains failure and gen-set start.
Timing relationships between mains return and MCB operation.
Timing relationships between GCB and MCB operations in AUTO mode.
Overview of the LiteEdit software for controller configuration and monitoring.
Step-by-step guide for replacing the controller's internal backup battery.
Specifications for the optional IL-NT RS232-485 interface card.