EasyManua.ls Logo

COMBAT CTU-90 - SECTION 4: Critical Considerations; Ventilation; Gas Supply; Electrical Supply

COMBAT CTU-90
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4: CRITICAL CONSIDERATIONS
7 of 46
SECTION 4: CRITICAL CONSIDERATIONS
4.1 Ventilation
It is important to ensure that there is adequate air
circulation around the heater to supply air for
combustion, ventilation and distribution in
accordance with local and national codes.
4.2 Gas Supply
It is important that the gas supply pipe is sized
correctly to provide the inlet pressure as stated on
the heater data plate. The gas supply pipe and
electrical connections must not support any of the
heater's weight.
4.3 Electrical Supply
A permanent 230 V 50 Hz electrical supply is
required at the main electrical terminals. The heater
also requires suitable energy controls in accordance
with
Section 11.
4.4 Flue
Choose heater siting to allow for the proper location
of the flue. Each heater mu st be fitted with an
individual and correctly sized sealed flue system
(
See Section 7).
No other appliance may be connected to the flue.
For room sealed installation, the air intake must be
the same size sealed system and the flue/air intake
must terminate at an approved concentric wall or
roof terminal.
DANGER
Electrical Shock Hazard
Disconnect electric before service.
Heater must be properly grounded.
Failure to follow these instructions can result
in death or electrical shock.

Table of Contents

Related product manuals