SECTION 7: FLUE INSTALLATION
15 of 46
Figure 6: Vertical and Horizontal Flue Termination - Type B
22
Appliance
Figure 7: Vertical and Horizontal Flue Termination - Type C
12
C
32
& C
62
Appliances
Wall
Terminal
Air Intake
Terminal Cover
Flue
Masterflash
Masterflash
Roof Terminal
Vertical
Option
Horizontal
Option
90°
Bend
Flue
Metal Sleeve
(25 mm air gap to
Combustible Material)
Wall
Plate
Wall
Terminal
Flue
Roof Terminal
90° Bend
Flue
Air Intake
Air Intake
Manifold
Manifold
Vertical
Option
Horizontal
Option
Plastic Cup
Masterflash
The minimum
gap must be
positioned at bottom
End View
Max wall thickness
335 mm
Model Concentric Flue Diameter
75-115 Cover (130mm) 200mm

Table of Contents