Tes t in g t h e Ins t al l at i on (c on t i n u e d)
If everything is installed correctly:
• The regeneration and process blowers turn on
• The regeneration heater turns on
• The process heater will energize (if configured as a stand alone dryer)
• The dryer’s desiccant wheel starts turning. (If the desiccant wheel does
not turn, turn off the dryer, disconnect from power, and verify that the desiccant
wheel tie has been removed
6 From the Dryer Detail screen, press the dryer stop button.
If everything is installed correctly:
• The blowers will continue running as needed to cool the
heaters. (Until regeneration heaters are less than 150°F
{66°C}.)
7 The test is over. If the dryer performed the normal operating
sequences as outlined, reconnect the material source to the
optional hopper receiver and begin normal operation. If it did
not, refer to the Troubleshooting section of the User Guide.
U s i n g Co m mu n ic a ti o ns (O pt i o n a l )
To use the optional Modbus, Ethernet, SPI or standard DeviceNet communications, see
the Addendum for hardware installation and configuration.
IMPORTANT: Be sure the cable tie
has been removed from the desic-
cant wheel.
DeviceNet connection
SPI connection
✐
NOTE: These communications can be left disconnected, if not in use.
Ethernet connection