EasyManua.ls Logo

Corghi ProLine 124 - Unwrapping

Corghi ProLine 124
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
104 ProLine 124-221-321-324 Operator manual
3. UNWRAPPING
Pay careful attention when unpacking, assembling, handling and installing the ma-
chine as described below. Failure to observe these instructions could damage the
machine and compromise operator safety.
WARNING
Before removing the machine from the pallet, make sure the items shown below have
been removed.
WARNING
Remove the upper part
of the package and make
sure that the machine
has not suffered damage
฀฀฀
the points for fastening to
the pallet.
-The machine consists of
ProLine 321 - 324 (fig.4A):
1 body
2 head
3 included
4 air tank (TI version only)
5 pole guard
6 arm guard
ProLine 124 - 221 (fig.4B):
1 body
2 head (with internal tank
for ProLine 124)
3 included
4A
4B

Related product manuals