EasyManua.ls Logo

Corghi ProLine 124 - Operator Position; OVERALL DIMENSIONS (MM)

Corghi ProLine 124
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
110 ProLine 124-221-321-324 Operator manual
6.1. OPERATOR POSITION
The figures 9a and 9b show the operator’s positions and the relevant hazardous areas (P)
during the various work phases:
A Bead breaking
B Tyre demounting and mounting
C Inflation area.
9a
9b
Before removing the machine from the pallet, make sure the items shown below have
been removed.
WARNING
RISK OF INJURY DUE TO CRUSHING. The column tilting and the self-centring clamp
opening/closing operation must be performed from working position B (fig.9a),
keeping hands away from machine moving parts.
WARNING
7. OVERALL DIMENSIONS (mm)
Maximum length A = 1200
Minimum width B1 = 1250
Maximum width B2 = 1700
Maximum height H = 2020

Related product manuals