EasyManua.ls Logo

corob FIRST 70 - Standard Supplied Material

corob FIRST 70
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SHIPPING, HANDLING AND UNPACKING - 15
4
A
Figure 4
b
a
d
c
Figure 5
5. With one person at the right side and another person on the left side, lift the machine straight up until the
pallet is free and can be removed by the third person.
6. Lower machine feet to support and level the machine properly, and make sure that the wheels are not
resting.
4.3.1 Standard material supplied
After unpacking the machine, make sure the following items are present:
1. Power supply cable. 2. Computer power cables.
3. USB cable. 4. RS232 cable.
5. Spare fuses. 6. Panel key.
7. Spare parts for humidier cap. 8. Equipment software tools standard CD.
9. User’s manual. 10. Adapter for Quart (1-liter) and Pint-size (0.5-liter) cans.
Depending on the options specied on the purchase order, you may also nd:
Management software and protection key.
Any accessories to be installed on the machine.
Make sure that all of the above items are included in the packing; if not, contact the manufacturer.

Related product manuals