At the beginning of the working day
• Check that the nozzle center is clean.
• Check that the sponge is clean and saturated; if it is necessary to saturate, use only appropriate liquid (the
choice of the liquid depends on the nature of the colorants, and must be done directly by the manufacturer
of the products used).
• Carry out system Initialization and Purge.
Things to remember
• Never turn the machine OFF.
• In the canisters, stirring of each colorant takes place automatically.
• Be careful not to ll the canisters with too much colorant. In case of overlling, refer as indicated in the
user’s manual.
• The colorant to be poured inside the canisters must be stirred manually. Do not use automatic shakers.
• Close the canisters with their lids immediately after lling operations.
• Remember to update accordingly the canisters lling levels via the management software.
• The sponge must be saturated at least twice a week (the frequency of intervention is indicative, since it
depends on the nature of colorants and the environment conditions).
At the end of the working day
• Rell the canisters.
• Update the canister lling levels in the management software.
• Shut down the computer. Do not shut off the machine.
It is recommended to carefully read the user’s manual.