9 | Electrical installation
Installer reference guide
104
ERGA04~08EAV3(A) + EHVZ04+08S18+23EA6V+9W
Daikin Altherma 3 R F
4P629093-1 – 2020.08
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
3 Fix the cable with cable ties to the cable tie mountings.
9.3.5 To connect the domestic hot water pump
Wires: (2+GND)×0.75mm²
DHW pump output. Maximum load: 2A (inrush), 230VAC, 1A
(continuous)
[9.2.2] DHW pump
[9.2.3] DHW pump schedule
1 Open the following (see "7.2.4To open the indoor unit"[451]):
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the domestic hot water pump cable to the appropriate terminals as
shown in the illustration below.