18 Commissioning
CAUTION
See "3 Specific installer safety instructions" [4 13] to make sure commissioning
complies with all safety regulations.
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
In this chapter
18.1 Precautions when commissioning.......................................................................................................................................... 109
18.2 Checklist before commissioning............................................................................................................................................. 109
18.3 SV unit test run ....................................................................................................................................................................... 110
18.3.1 About the SV unit test run ..................................................................................................................................... 110
18.3.2 About airflow requirements................................................................................................................................... 111
18.3.3 About measuring the airflow rate.......................................................................................................................... 112
18.3.4 To perform a SV unit test run ................................................................................................................................ 113
18.3.5 Troubleshooting during a SV unit test run............................................................................................................. 114
18.4 System test run ....................................................................................................................................................................... 115
18.1 Precautions when commissioning
NOTICE
Before starting up the system, the unit MUST be energised for at least 6 hours to
avoid compressor breakdown during startup.
NOTICE
ALWAYS complete the refrigerant piping of the unit before operating. If NOT, the
compressor will break.
INFORMATION
During the first running period of the unit, the required power may be higher than
stated on the nameplate of the unit. This phenomenon is caused by the compressor,
that needs a continuous run time of 50hours before reaching smooth operation and
stable power consumption.
18.2 Checklist before commissioning
1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
You have read the complete installation and operation instructions described in the
installer and user reference guide.