18 | Commissioning
Installer and user reference guide
110
SV1A25AJV1B+SV4~8A14AJV1B
VRV 5 safety valve unit
4P749917-1 – 2023.09
The SV unit is properly mounted.
The field wiring has been carried out according to the instructions described in this
document, according to the wiring diagram and according to the applicable national wiring
legislation.
The drain piping is properly installed and insulated, and drainage flows smoothly. Check for
water leaks.
Possible consequence: condensate water might drip.
There are NO missing phases or reversed phases.
The system is properly earthed and the earth terminals are tightened.
The fuses or locally installed protection devices are installed according to this document,
and have NOT been bypassed.
The power supply voltage matches the voltage on the identification label of the unit.
There are NO loose connections or damaged electrical components in the switchbox.
In case no safety measures are required, the following measures are correctly applied:
No safety measures are attached.
The correct field settings are made.
In case an external alarm is required, the following safety measures are correctly applied:
The external alarm is connected and powered.
The correct field settings are made.
In case natural ventilation is required as safety measure, the following safety measures are
correctly applied:
Partition between rooms for natural ventilation meets the requirements.
The correct field settings are made.
In case a ventilated enclosure is required, the following safety measures are correctly
applied:
The ducting is properly installed and insulated.
The extraction fan is connected and powered.
The air inlet (damper) is not obstructed.
The correct field settings are made.
Also follow the outdoor unit's checklist. See the installation and operation manual delivered
with the outdoor unit.
18.3 SV unit test run
18.3.1 About the SV unit test run
The SV unit test run has to be performed on all SV units in the system, before the
test run of the outdoor unit. The SV unit test run has to confirm that the required
safety measures are properly installed. Even when no safety measures are
required, it is necessary to perform this SV unit test run and confirm the result,
because the test run of the outdoor unit checks this confirmation for all SV units in
the system.
Depending on the safety measure and the configuration of the SV unit, it is
required to perform the SV unit test run on a specific SV unit of the system.
Note: Do not perform a SV unit test run on more than one SV unit at a time.
No safety measure: all SV units with no safety measures.