EasyManua.ls Logo

Danfoss MP1 - MP1 EDC Control Assembly

Danfoss MP1
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MP1 EDC control identification
D150
D250
D300 (2x)
F00B
F00A
Item Description Wrench size Torque
D150 Control gasket - -
D300 Dowel pins - -
D250 Cap screw 5 mm internal hex 13 Nm [9.8 lbf•ft]
F00B Servo orifice 3 mm internal hex 7.9 Nm [5.8 lbf•ft]
F00A Servo orifice 3 mm internal hex 7.9 Nm [5.8 lbf•ft]
Controls inspection
Inspect the machined surfaces on the control and top of the pump. If you find any nicks or scratches,
replace the component.
MP1 EDC control assembly
Ensure you install dowel pins (D300) in the housing before installing the control.
1. Install a new gasket (D150).
2. Install dowel pins (D300) in the housing.
W
Warning
If the feedback pin comes off during operation, the pump will lose control and cause a potentially
hazardous situation. Ensure feedback pin is properly torqued before continuing with reassembly.
Service Manual
MP1
Minor repair
©
Danfoss | April 2019 AX00000244en-000201 | 53

Table of Contents

Related product manuals