MAINTENANCE/INSPECTION CHECKLIST
(NOTE: Maintenance/inspection items are monthly unless otherwise specified.)
Air Cooled Condenser, Condensing Unit, or Fluid
Cooler (if applicable)
☐ Inspect coil/clean if required
☐ Inspect motor/motor mounts
☐ Inspect fan blade(s)
☐ Check wiring
☐ Inspect piping for leaks
Dry Cooler (if applicable)
☐ Inspect coil/clean if required
☐ Inspect motor/motor mounts
☐ Inspect fan blade(s)
☐ Check wiring
☐ Inspect piping for leaks
Glycol Pump – Monthly (if applicable)
☐ Glycol leaks (pump area)
☐ Pump operation
☐ Auto air vent clean of mineral deposits
Glycol Pump – Quarterly (if applicable)
Record pump pressures: #1
Suction: PSIG
Discharge: PSIG
Record pump current draw:
L1 A L2 A L3 A
Record pump pressures: #2
Suction: PSIG
Discharge: PSIG
L1 A L2 A L3 A
Equipment Runtimes
Blower hours
Compressor #1 hours
Compressor #2 hours
Condenser hours
Reheat #1 (if equipped) hours
Reheat #2 (if equipped) hours
Reheat #3 (if equipped) hours
Humidifier (if equipped) hours
Dehumidification hours
Energy Saver (if equipped) hours
☐ Reset all to zero runtimes