EasyManua.ls Logo

Dehler 35 cws - Headsail Systems

Dehler 35 cws
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the boat’s specification includes a
spinnaker and the pole downhaul is to be
led aft, we recommend replacing Reef 2,
which is then taken forward and belayed on
the mast.
If possible, tie control lines together into a
bundle, which is fed aft using a length of
stiff wire.
When unrigging, don’t forget to pull
messenger lines through the outer halyard
conduits.
Fig. 18
Control lines, and a stiff wire, are bound with tape side-
to-side in a flat bundle, and are pulled aft through the
conduit below deck.
Headsail
Topp Reff 2090 below-deck roller
headsail system
The Topp Reff roller furling system has
been tried and tested on many boats. When
it is combined with the cruising jib and the
Dehler quick reefing mechanism, a wide
range of wind strengths can be covered
without having to change sail. Please refer
to Page 20. The system can be fitted and
dismantled easily on the specially extended
forestay. See the instructions on fitting
included among the documents
accompanying your boat.
Fig. 19 Roller furling system
TIP
It is difficult to pull lines with frayed ends
through the narrow duct. Check the ends
at the close of each season.
Dehler 35 cws
17
https://www.boat-manuals.com/

Related product manuals