Status text Condition
MIN DG LOAD CHARGING The battery is charging to make sure the gensets are operating at the minimum genset load.
MOUNT CAN CONNECTOR Quick setup.
MPE ACTIVE The controller is in auto mode and exporting power to the mains.
NOT IN MAN OR SEMI The controller tried to open or close the mains breaker in auto mode.
NOT POSSIBLE Unable to do the requested command.
PEAK SHAVING ACTIVE The controller is in auto mode and doing peak shaving.
PEAK SHAVING AUTO The controller is in auto mode and ready to respond.
PEAK SHAVING SEMI The controller is in semi-auto mode and waiting for operator input.
POWER DERATE Power derate is active.
PROGRAMMING LANGUAGE Downloading the language file, using the PC utility software.
QUICK SETUP ERROR Quick setup of the application failed.
RAMP FREEZED Stopped ramping (ramping frozen).
RAMP TO #####kW
The power ramp is ramping in steps. The next step that is reached after the timer has expired is
displayed.
RAMPING Ramping up to the set point.
READY AMF AUTO The controller is in auto mode and the ESS is stopped.
READY AUTO OPERATION The controller in auto mode and ready for breaker operation (no active BTB trip alarm).
READY FIXED P AUTO The controller is in auto mode and the ESS is stopped.
READY ISLAND AUTO The controller is in auto mode and the ESS is stopped.
READY LTO AUTO The controller is in auto mode and the ESS is stopped.
READY MPE AUTO The controller is in auto mode and the ESS is stopped.
READY PEAKSHAV AUTO The controller is in auto mode and the ESS is stopped.
READY TO BE ADDED Easy connect: Controller is ready to be added.
RECEIVE COMPLETED The broadcast application has been received.
RECEIVE ERROR There was an error receiving the broadcast application.
RECEIVING APPL. Receiving the broadcast application on the CAN line.
REM. FROM PMS ESS Easy connect: Remove ESS from PMS plant.
REMOVE CAN CONNECTOR Remove the power management CAN lines.
SELECT OPERATION MO An operation mode has not been selected.
SELECT PLANT MODE A plant mode has not been selected.
SETUP COMPLETED Successful update of the application in all the controllers.
SETUP IN PROGRESS A new controller is being added to the existing application.
SETUP STAND ALONE? Easy connect: Configure the controller in a stand-alone application.
SIMPLE TEST Test mode is activated.
SOC STOP LIM > THR2 Warning: The SOC genset stop limit is more than the SOC threshold 2.
START DG(s) IN ###s Genset start timer: Load dependent start/stop.
START NEW PLANT Easy connect: Configure a new PMS plant.
START PREPARE The start prepare relay is activated.
START RELAY OFF The start relay is deactivated during the start sequence.
START RELAY ON The start relay is activated.
OPERATOR'S MANUAL 4189341343A EN Page 31 of 36