PS6500 Hardware Maintenance Basic Array Information
1-12
Figure 1-18: Routing Path on the Cable Management System
Connect all three fasteners on the arm and place the cables below the arms. See Figure 1-19.
Figure 1-19: Attaching the Hook-and-Loop Fasteners
2. Route the cables along the middle arm of the three-arm assembly, going from 3 to 4 in Figure 1-18.
3. Route the cables along the one-arm assembly (connected to the top of the left and right rails), going from 5 to 6
in Figure 1-18.
After routing the cables, the installation should resemble Figure 1-20.
Figure 1-20: Cables Attached to the Cable Management System