PS6500 Hardware Maintenance Maintaining Power Supply and Cooling Modules
4-6
In addition, use the cable management system to organize your power cables. See Using the Cable Management
System on page 1-10 for more information.
Note: If you detached one side of the cable management system from the rear chassis flange for better access, re-
attach it.
If the array was shut down, turn on power to the array. See Turning on Power to an Array on page 1-13.
Make sure the new module is operational. See Power Supply and Cooling Module Status on page 4-2.
Caution: After installing a power supply and cooling module, wait until the new module initializes before
removing the other module. Once connected to a source of power, module initialization generally
completes in one to ten seconds. Initialization is complete when the LCD panel (located behind the
bezel) no longer shows the module failure.