EasyManua.ls Logo

Dell Force10 E300 - Page 12

Dell Force10 E300
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 Installing the Hardware
E1200i TeraScale and ExaScale AC Chassis Ground
E1200i TeraScale and ExaScale DC Chassis Ground
Step Task
1 Locate the chassis ground connector nuts on the rear of the chassis.
2 Install the grounding cables to the ground nuts. The grounding cable
must comply with your local electrical codes in size and color (typically
the color is green or green with yellow stripe).
NOTE: Grounding cables must be terminated only with a UL-
listed 2-hole lug with 1/4-inch holes on 3/4-inch spacing.
Cable Connector Required for E1200i AC
3
Use ANSI UNC 1/4-20 x 12 bolt.
4 Tighten the bolt (torque should not exceed 25 inch/lbs).
5 Connect the opposite end of the grounding cable to the nearest
appropriate facility grounding post.
Step Task
1 Remove one outer nut and one washer from each of the six studs. One
nut should remain, tight on the stud. If the inner nut is loose, re-tighten it
to 25 inch/lbs, maximum.
2
Locate the chassis ground connector studs on the PEM front panel. The
two rightmost studs are the ground connection.
0.750"
High-strand-count
conductor
diameter
2 Holes
All measurements in inches.
FN00011A
0.267

Other manuals for Dell Force10 E300

Related product manuals