B-8
Procedures to hoist and lower the machine (Continued)
Step No. Procedure
5
After verifying that the slings do not come into contact with any part of the machine, hoist
the machine slowly so that it should not be shocked.
・The machine weighs about 1,300 kg.
・Ensure that the employed crane is rated for a hoisting load of 2,000 kg or heavier and
withstands the machine weight, boom length and hoisting angle.
6
Unload the machine.
・Slowly lower the machine so as not to shock it.
7
Remove the hooks (total 4) from the machine. To remove each hook, you should first
remove the four hexagon socket-head screws retaining it.
Hook (front)
(1 each at each side of the machine)
Hook (rear)
(1 each at each side of the machine)
Continued in the next section.