B-2
1. Machine Installation
Operation flow
This section describes the procedures to install the machine in the flow of the operation steps indicated
below.
1-1 Hoisting and Lowering the Machine
1-2 Transferring the Machine
1-3 Leveling the Machine
1-4 Installation of Machine Anchors [Optional Accessory]
1-5 Piping Connection
1-6 Power Cable Connection
1-7 Connection of Power Cables of Uninterruptible Power Supply Unit [Optional Accessory]
1-8 Removal of Retainers Used for Machine Transportation
1-9 Installation of Machine Outer Covers
1-10 Air Supply
1-11 Wheel Coolant and Spindle Coolant Water Supply
1-12 Power Supply