B-56
2-4. Installation of Retainers for Machine Transportation
Operation flow
CAUTION
Before transporting the machine, make sure to install the retainer jigs to the Y-
axis and Z-axis
If you transport the machine without securing these movable components in their
positions, it may take a great deal of time later to readjust the machine's grinding
accuracy.
2-4-1 Installation of Y-axis Retainer Jig
2-4-2 Installation of Z-axis Retainer Jig