2. Machine Relocation
Operation flow
2-1 Terminating Machine Operation
2-2 Water Purge (by DISCO Customer Engineers)
2-3 Removal of Machine Outer Covers
2-4 Installation of Retainers for Machine Transportation
2-5 Piping and Wiring Disconnection
2-6 Machine Transfer
Hoisting and Lowering the Machine (Refer to Section 1-1 of this chapter)
Transferring the Machine (Refer to Section 1-2 of this chapter)
Installing the Machine (Refer to Section 1 of this chapter)