B-31
1-6-4. Connection of Power Cable of Duct Unit [Optional Accessory]
Equipment you must have ready
Phillips screwdriver
Slotted screwdriver
Procedures to connect the power cable of the duct unit to the machine
Step No.
Procedure
(Continued from the previous section)
1
Connect the PE line of the duct unit power cable to the earth bar located at the bottom part
of the control box.
Earth bar
(Terminal for connection)
E: No. 14
2
Connect each power line of the duct unit power cable to the corresponding terminals on
the terminal block (TB2).
・Make sure to connect each line to its terminal correctly referring to the following figure.
Terminal block (TB2)
(Terminals for connection)
L1: No.12
L2: No.13
L3: No.14
Continued in the next section.