Dobot Magician E6 User Guide
Issue V1.3(2023-01-16) User Guide Copyright © Yuejiang Technology Co., Ltd.
27
7.5 Debugging
After turning on the external power supply, short-press the power switch. When the indicator
lights of the robot arm turn blue, you can connect the robot arm, enable and jog it for debugging
through the operation terminal.
For specific operations, refer to the control software user guide.