EasyManua.ls Logo

Dormakaba ED50 - Page 40

Dormakaba ED50
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40
ED50/ED100/ED250 09-2021DL4617-003
dormakaba ED50/ED100/ED250 OHC Header
Setup and Troubleshooting Instructions
Chapter 14
. Customer supplied doors - pair door installation
 Pair door installation
Fig. 14.1.1 Pair door inswing example; ready for door installation
1 Overhead arm
rotated to 70
degrees or greater
2 Floor pivot
NOTICE
Door, jambs, and finger guards by customer.
Door installation:
Customer responsibility.
WARNING
Door installation must meet ANSI/BHMA
standards as well as any applicable local
building codes.
.. Conditions prior to installing doors.
. System setup (Chapter ) performed for each
ED operator.
. Overhead arms rotated to  open position or
greater.
.. Floor pivots installed by customer.
. Floor pivots installed by customer.
CAUTION
Jamb edge to floor pivot centerline distance:
 /". Reference Paa. ..
. Bottom pivot hardware installed in floor by
customer for both doors.
.. Check ED operator axle to floor pivot plumb.
NOTICE
Using plumb bob, check ED operator axle to
floor pivot plumb for each door.
.. Hang doors - reference single door installation.
. Reference steps in Chapter , single door to hang
each door.
2
2
1
1
. Perform learning cycle for each door
.. Perform learning cycle for each door.
Reference Chapter , Para. ..
. Set power fail closing speed
.. Set power fail closing speed for each door.
Reference Chapter .

Other manuals for Dormakaba ED50

Related product manuals