EasyManua.ls Logo

Eaton 93E Series - 1 Introduction

Eaton 93E Series
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton 93E UPS (20–30 kVA, 208/220V) Installation and Operation Manual 164000301—Rev 04 1
CChhaapptteerr 11 IInnttrroodduuccttiioonn
The Eaton
®
93E 20–30 kVA uninterruptible power supply (UPS) is a true online, continuous-duty,
transformerless, double-conversion, solid-state, three-phase system, providing conditioned and uninterruptible
AC power to protect the customer's load from power failures.
The Eaton 93E 20–30 kVA online power protection system is used to prevent loss of valuable electronic
information, minimize equipment downtime, and minimize the adverse effect on production equipment due to
unexpected power problems.
The Eaton 93E 20–30 kVA UPS continually monitors incoming electrical power and removes the surges, spikes,
sags, and other irregularities that are inherent in commercial utility power. Working with a building's electrical
system, the UPS system supplies clean, consistent power that sensitive electronic equipment requires for
reliable operation. During brownouts, blackouts, and other power interruptions, batteries provide emergency
power to safeguard operation.
The UPS is housed in a single free-standing cabinet, with safety shields behind the door for hazardous voltage
protection. Figure 1 shows the Eaton 93E 20–30 kVA UPS.
NOTE 1 Startup may be performed by the customer’s battery qualified electrical contractor for
single (not parallel) UPS installations without any accessory cabinets such as an External
Battery Cabinet.
NOTE 2 Startup and operational checks for parallel systems or installations with accessory
cabinets must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms specified on product's resources page become void. See
Chapter 11 Warranty for details. This service is offered as part of the sales contract for
the UPS. Contact an Eaton service representative in advance (usually a two-week notice
is required) to reserve a preferred startup date.
Figure 1. Eaton 93E UPS (20–30 kVA)

Table of Contents

Related product manuals