Eaton 93E UPS (20–30 kVA, 208/220V) Installation and Operation Manual 164000301—Rev 04 65
CChhaapptteerr 77 UUPPSS OOppeerraattiinngg IInnssttrruuccttiioonnss
This section describes how to operate the UPS.
NOTE 1 Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary startup
verifies all electrical interconnections to ensure the installation was successful and the
system operates properly.
NOTE 2 Read this section of the manual and have thorough knowledge of UPS operation before
attempting to operate any of the controls.
77..11 UUPPSS CCoonnttrroollss aanndd IInnddiiccaattoorrss
The controls and indicators identified and described in this section are used to control and monitor UPS
operation. Figure 38 shows the controls and indicators and Figure 39 shows the UPS breakers.
Figure 38. UPS Controls and Indicators