Eaton 93E UPS (20–30 kVA, 208/220V) Installation and Operation Manual 164000301—Rev 04 31
Figure 12. UPS Power Terminal Cover Base Installation and Conduit Landing Wire Entry Locations
Power Terminal Cover
Base Installed
Conduit Landing for AC Input, Output,
and Bypass, DC Input, and REPO.
(Install conduit to bottom of plate.)
Back
44..44 EExxtteerrnnaall BBaatttteerryy CCaabbiinneett IInnssttaallllaattiioonn
If installing External Battery Cabinets (EBCs), refer to the Eaton 93E External Battery Cabinet Installation
Manual listed in paragraph 1.7 For More Information for installation instructions.
After the EBC is installed, proceed to paragraph 4.5 Integrated Transformer Cabinet Installation if installing an
Integrated Transformer Cabinet (ITC), to paragraph 4.6 Sidecar Integrated Accessory Cabinet-Bypass if
installing an Sidecar Integrated Accessory Cabinet-Bypass (SIAC-B), to paragraph
4.7 Integrated Accessory Cabinet-Tie if installing a Integrated Accessory Cabinet-Tie (IAC-T), to paragraph
4.8 Integrated Accessory Cabinet-Tie and Bypass if installing a Integrated Accessory Cabinet-Tie and Bypass
(IAC-TB), or to paragraph 4.9 Integrated Accessory Cabinet-Distribution if installing an Integrated Accessory
Cabinet-Distribution (IAC-D); otherwise, proceed to paragraph 4.10 External Power Wiring Installation to
complete the wiring of the UPS.
44..55 IInntteeggrraatteedd TTrraannssffoorrmmeerr CCaabbiinneett IInnssttaallllaattiioonn
If installing an ITC, refer to the Eaton 93E Integrated Transformer Cabinet Installation Manual listed in paragraph
1.7 For More Information for installation instructions.
After the ITC is installed, proceed to paragraph 4.6 Sidecar Integrated Accessory Cabinet-Bypass if installing an
Sidecar Integrated Accessory Cabinet-Bypass (SIAC-B), to paragraph 4.7 Integrated Accessory Cabinet-Tie if