26 Eaton 93E UPS (20–30 kVA, 208/220V) Installation and Operation Manual 164000301—Rev 04
Figure 7. Removing the Front Shipping Bracket
Front Door
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Front Shipping Bracket
Pallet
5. Remove four bolts securing the rear shipping bracket to the cabinet and four bolts securing the bracket to
the pallet (see Figure 9). Remove the rear shipping bracket. If installing the cabinet permanently, retain the
shipping bracket and securing hardware for later use.
WARNING
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions are not closely
followed, the cabinet may cause serious injury.
6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the
cabinet is clear of the ramp (see Figure 10).
7. Roll the cabinet to the final installation location.
8. If installing the cabinet permanently, retain the shipping brackets and hardware; otherwise, recycle the
pallet, ramp, and shipping brackets in a responsible manner.
UPS System Installation