EasyManua.ls Logo

Eaton 93PM G2 Series - Page 56

Eaton 93PM G2 Series
141 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Move the cabinet to its final installation location. Turn the leveling feet
clockwise until the cabinet is levelled.
10. To secure the UPS cabinet in position, attach the shipping brackets on both
sides of the cabinet with the angle facing outward. It is recommended to
attach the lower cover plates to the ends of the cabinet (included in the
package).
© Eaton Corporation plc 2020. All rights reserved. Revision: 001 Document ID: P-164000956 56 (141)
Eaton 93PM G2 UPS 50 360 kVA User’s and Installation Guide

Table of Contents

Related product manuals