EasyManua.ls Logo

Eaton 93PM G2 Series - Page 72

Eaton 93PM G2 Series
141 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 25: CAN and Pull-Chain wiring for parallel UPS with MOBs
Note that the shield cable must be connected on one end only.
Figure 26: CAN and Pull-Chain wiring for parallel UPS without MOBs
A External parallel connector,
UPS 1
5 GND (ISP)
B External parallel connector,
UPS 2
6 Earth
C External parallel connector,
UPS 3
7 CANBL
1 External pull chain 8 CANB_1
2 GND-S * Terminate the first and last UPS with a jumper.
3 CANBH ** Connect the shield from one end only.
4 CANBL
© Eaton Corporation plc 2020. All rights reserved. Revision: 001 Document ID: P-164000956 72 (141)
Eaton 93PM G2 UPS 50 360 kVA User’s and Installation Guide

Table of Contents

Related product manuals