EasyManua.ls Logo

Eaton Fuller AT-1202 - How to Perform Final Installation of the Shifting Controls

Eaton Fuller AT-1202
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly and Installation
51
Assembly and Installation
3. Use a soft bar to start the countershaft front bearings on the
shafts and into the case bores. Use a bearing driver to com-
plete installation. The beveled ID of each bearing faces into
the case.
4. Install the two countershaft front bearing covers.

Related product manuals