EasyManua.ls Logo

Eaton Powerware 5125 - Tools Required; Rack-Mount Setup

Eaton Powerware 5125
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications S 164201698 Rev 1
4
Tools Required
To assemble the components, the following tools may be needed:
S Medium flat-bladed screwdriver
S #2 Phillips screwdriver
S 8mmwrenchorsocket
Rack-Mount Setup
The rail kit can be mounted in 48-cm (19-inch) panel racks from 61 to
76 cm (24 to 30 inches) deep.
NOTE Mounting rails are required for each individual cabinet and are located in the UPS
and EBM cartons. All hardware is supplied.
NOTE If placing the E65 in a rack with existing equipment, the rack must be reconfigured
to install the heaviest item in the bottom of the rack. The UPS weighs 73 kg (161 lb) and the
EBM weighs 77.1 kg (170 lb).
Each rail kit requires one (1) of each item in the following list:
S Left adjustable rail assembly (located in the UPS and EBM cartons)
S Right adjustable rail assembly (located in the UPS and EBM cartons)
S Rail hardware kit (located in the E65 UPS and EBM accessory kits)

Other manuals for Eaton Powerware 5125

Related product manuals