INSTALLATION
 Eaton 9135 Two-in-One UPS (5000/6000 VA) User's Guide  S  164201726 Rev 3 www.eaton.com/powerquality
37
RPO Installation
Installation of the RPO function must be carried out in compliance with
applicable regulations. The cable is not included.
In order to fully de-energize devices and the Eaton 9135 with the RPO
port, it is necessary to:
S Use a two-position switch (normally-open or normally-closed contact
and held more than one second).
S Connect this RPO switch to a device that trips all breaker(s) located
upstream
(1)
 and downstream
(2)
 the Eaton 9135 UPS. This can be
achieved by means of a shunt trip:
-
(1)
 If not, the output devices could be powered again through static
switch when the two-position switch is released.
-
(2)
 If not, the output devices will remain powered several seconds
after the RPO activation.
NOTE  The internal batteries will remain connected to the power module after RPO
activation.
RPO Contact Normally-Open RPO Contact Normally-Closed
5 Vdc to 27 Vdc
5 Vdc to 27 Vdc
RJ-12 (6p6c) RJ-12 (6p6c)
Figure 19. RPO Communication Port
S Signal:
- Activation voltage:  5 Vdc to 27 Vdc
- Current:  10 mA maximum