EasyManua.ls Logo

Eaton Powerware 9355 - Floor Loading; Clearances

Eaton Powerware 9355
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UPS SETUP
EATON Powerware
®
9355 UPS (20/30 kVA) Installation and Operation Manual S 164201626 Rev B www.powerware.com
12
Unloading the Cabinet(s)
The following tools are required for unloading the cabinet(s):
S 15 mm wrench or socket
S 7 mm nut driver or socket
S Adjustable wrench or channel-locks
CAUTION
The UPS and optional cabinets are heavy (see page 9). Unloading the cabinets requires at least two people
to safely remove the cabinets from the pallet.
To remove the UPS or optional cabinets from the shipping pallet:
1. Remove the two M10 bolts securing the rear shipping bracket to the pallet (see
Figure 4).
2. Remove the four M8 screws securing the rear shipping bracket to the cabinet
rear panel and remove the bracket. Retain the hardware for later use.
NOTE Be sure to retain the rear shipping bracket and hardware for later re-assembly if you plan to
permanently mount the cabinet.
M8 Screws
M10 Bolts
Figure 4. Removing the Rear Shipping Bracket (UPS Shown)

Table of Contents

Other manuals for Eaton Powerware 9355

Related product manuals